Wednesday, December 16, 2009

1931 Model A Pickup - post 10 - Work on the doors begins

Bill applies a thin coat of putty to smooth out the door skins and to blend in where the new metal was welded on the bottoms.

 

Along the tops of the doors the rust (removed by sandblasting) had left a few holes.  The metal was still strong so Bill filled the holes and pits with DuraGlass - a really dense, waterproof putty.  It won't be long and the doors will be in primer, ready for paint. 



No comments:

Post a Comment